Our major merchandise are Needle Roller bearings, Cylindrical Roller Bearings, Rod stop Bearings, Spherical simple bearings, Observe roller Bearings for Guideway, Roller Bearings, Blend Bearings for forklifts, H2o Pump Bearings, SNR Vehicle Bearings and all kinds of Spherical Bearings. Our product range also handles locking assemblies (clamping factors/locking device), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod ends and yokes. We are aiming to fulfill the requires of the consumers around the globe.. EPT EPTT Skilled Lathe EPTT
For Turning Tyre Mildew commaGrooves comma Flange commaEPTT commaWheel comma Shaft commaEPT Mold comma Railway Parts commaWheel Hub Turbine commaetc
1 time period OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Qualities colon
All factors of EPTT are EPTTed overseas renowned manufacturers comma these kinds of as FANUC or SIMENS EPTT System sol SchneiEPTTEPT EPTT program comma Japanese NSK EPTT comma ABB EPT amp EPTT box solEPT box comma and so on interval We can also configurate per buyer aposs EPTT request and requires period of time Our Engineers can design distinct configurations according to diverse workpieces traits period of time
1 interval rpar This type of lathe can be developed into CNC Milling Lathe which has features of Milling and Turning comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. screw thread comma conical floor comma curved surface comma interior boring comma etc interval
two time period rpar This lathe adopts frequency management technique as its primary EPT system semi EPTn by frequency management motor comma the speed of major-shaft realizes stepless speed regulating comma hence possessing diverse speeds to fulfill rational slicing speed demands for the machining of diverse sort of operate-piece time period
three period rpar This lathe is composed of lathe mattress comma selective headstock comma tailstock comma blade adapter comma electric powered control method comma lubrication technique comma and so on period Selective headstock and tailstock are put in at the still left and rigEPTT facet of lathe bed respectively period
four time period rpar The main shaft can understand stepless pace regulating in a range of 10~300r solmin semi and the primary spindle entrance bearing adopts higher-precision double row cylindrical roller bearings comma having substantial-diploma of rigidity and rotary precision and straightforward to modify period
five period rpar EPT Rigidity comma Balance and EPT Servicing colon All castings are manufactured of high-power meehanite EPTT250 period of time which is notably suited for large reducing time period All large castings stand the check of annealing and vibration growing older and interior anxiety is eradicated comma so the total precision is drastically increased and processed areas are located with large geometric accuracy time period
Our Basic principle colon MaXiHu (West EPT) Dis.mize Consumer aposs Profitability unEPTTthe bare minimum commit EPT period
EPTT Lathe is Our EPT Traits
Optional Variety colon
one time period EPTT comma EPT Box commaCNC EPTT Technique can be specified by customer
2 time period EPT Protect solFlash XiHu (West EPT) Dis.hu (West EPT) Dis. for EPTT can be optional
Software colon This is a CNC horizontal roller lathe which is suitable for substantial-pace steel and carbide slicing device to put into action coarse and fine stock getting rid of and slicing on the outer cylindrical area of roller of various supplies semi it also can be utilised for tough and complete machining of other shaft components period
2 period of time StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd EPTnical Parameters
Name | CK61100 | CK61125 | CK61160 | CK61200 | CK61250 | |
Description | Device | |||||
Max period of time EPTg more than bed | mm | a thousand | 1250 | 1600 | 2000 | 2500 |
Max interval EPTg Above the skateboard | mm | 600 | 800 | 1200 | 1500 | 1800 |
Max period of time WeigEPTT of Perform-piece | T | one | 1 | 2 | two | three |
Max time period Duration of Operate-piece | mm | 700 | seven-hundred | seven hundred | seven-hundred | 700 |
EPTs of Spindle Pace | sol | Infinitely Variable Speed solstep-significantly less pace | ||||
Variety of Spindle Velocity | r solMin | 10-three hundred | 10-200 | 10-160 | 10-160 | four-eighty |
Chuck Diameter | mm | 800 | a thousand | 1250 | 1600 | 2000 |
EPTT Diameter of Major Front Shaft | mm | a hundred ninety | one hundred ninety | 220 | 220 | three hundred |
X commaZ X commaZ-AXiHu (West EPT) Dis.s Feed Variety | mm solMin | -3000 | ||||
Horizontal Stroke | mm | five hundred | 650 | 800 | a thousand | 1250 |
EPTTitudinal Stroke | mm | seven-hundred | 700 | seven-hundred | seven-hundred | seven hundred |
Major Driving EPT | Kw | Variable Frequency 11Kw-4 | Variable Frequency 15Kw-four | Variable Frequency 22Kw-four | Variable Frequency 30Kw-4 | Variable Frequency 45Kw-four |
Rermarks colon
one period The over 5 designs of CNC Lathes are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also design and manufacture EPT lathe in accordance to the person aposs workpiece features interval
two period This collection horizontal Lathe EPTTs have been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile for machining railway areas comma vehicle elements comma mining and metallurgy comma delivery creating comma wind EPTT and other EPTTry industry time period
EPT Client aposs Praise for our Item and Administration
3 time period After-sale Support and Routine maintenance
1 period We provide expert specialized training for end users apos operators and upkeep personnel to enable them to effectively use and work the lathe and have out typical servicing period of time
2 interval Warranty time period colon One 12 months following acceptance of the lathe time period
3 period In scenario of any good quality problem located throughout operation comma the manufacturing facility will dispatch staff to the consumer aposs place within forty eight hours lpardomestic end users rpar amp within three daEPTT lparEPT Consumer rpar and the specialized employees gained apost depart before resolving the malfuntion period
four time period The firm will freely supply different EPT and mechanical areas for the bought lathe timely within guarantee period period
five period The company will provide lifetime promise for the consulting solutions in terms of application comma routine maintenance comma fix comma renovation comma and so on of equipments period of time
For much more particulars comma you should feel free to speak to us period Thanks excl